|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
Excellent service manual, the only known point of note is the alignment of improvability scanned pages within the pdf page. The resolution is good.
 ;
I was very glad recieving the service manal from You. Additionaly very fast. Extremaly nice servicing. Thanks very mach! Now my GX-220 working better, than it was made. Alexander from Moscow, Russia/
 ;
Sweet! I won the item on eBay and couldn't adjust the geometry or even keep a steady picure. This guide has the full schematics (not available anywhere else as far as I could tell), and was a bargain for the wealth of knowledge it contains. I hooked it up to my testing equipment, tweaked a few potentiometers and got it playing videogames in no time. Thanks!
 ;
It was just what I need to fix my old BMW's CD player. Very convenient also. Thank you.
 ;
Great Manual! It contains all the wiring schematics and mechanical exploded views that are essential for service and repair. I was surprised I even found this for such an old machine. Only wish I knew of this site many years ago.
Cycle
1. Installation (Connecting the piping between indoor and outdoor unit)
Indoor unit Liquid side Outdoor unit
Gas side
Gas cylinder
Lo
R22
Purge the air
� Installation
(1) Connect the piping between the indoor and outdoor unit firmly. � Incorrect connection may cause the leakage and incomplete vacuuming. (2) Attach the charging hose (manifold gage) to the service port. � Charging hose is necessary to check the pressure and to inject R22 for leakage test. � The valve of charging hose must be closed before being connected. (3) Inject the 100~300g R22 through the charging hose opening the valve. (4) Check the joint part using a gas detector or soapy water for leakage. � On checking, the service valve of main service port must be closed, this test is only for checking whether pipe connection is ok or not. (5) If there is no leakage, discharge R22 in piping completely into tank for retrieving. � Complete discharge is needed for vacuuming. � If leakage is found, please fasten the joint more tightly. (6) After closing the valve of charging hose, disconnect the tank and connect the vacuum pump to charging hose and open the valve again for vacuuming. (7) Turn on the vacuum pump until the pressure drops below 0kg/cm2. (8) After vacuuming, disconnect the vacuum pump and open the spindle of service port (liquid-side) slightly for 30 sec and then open the spindle of (gas side) with hexagonal wrench. (9) Open the liquid side completely first and then the gas side fully in order.
�32�
|
|
 |
> |
|