|
Who's Online
There currently are 6043 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
Very good quality, prompt response. This website has reasonable prices and wide range of manuals that are hard to find.
;
The document was usefull, and it was exactly what I was looking for.
;
OK?..manual is complet and helpfull... for repairing such a old and rare boombox like JVC PCM it is necessary...
;
Super Anleitung. Ordentliche Auflösung. Das ganze noch in Deutsch wäre zu schön. Alle Datenblätter sind sauber Kopiert und alle Leitungswege sind sauber ausgeführt
;
Thanks God for the internet and thanks for the service like this - proffessional solution on time.
Cycle
1. Installation (Connecting the piping between indoor and outdoor unit)
Indoor unit Liquid side Outdoor unit
Gas side
Gas cylinder
Lo
R22
Purge the air
� Installation
(1) Connect the piping between the indoor and outdoor unit firmly. � Incorrect connection may cause the leakage and incomplete vacuuming. (2) Attach the charging hose (manifold gage) to the service port. � Charging hose is necessary to check the pressure and to inject R22 for leakage test. � The valve of charging hose must be closed before being connected. (3) Inject the 100~300g R22 through the charging hose opening the valve. (4) Check the joint part using a gas detector or soapy water for leakage. � On checking, the service valve of main service port must be closed, this test is only for checking whether pipe connection is ok or not. (5) If there is no leakage, discharge R22 in piping completely into tank for retrieving. � Complete discharge is needed for vacuuming. � If leakage is found, please fasten the joint more tightly. (6) After closing the valve of charging hose, disconnect the tank and connect the vacuum pump to charging hose and open the valve again for vacuuming. (7) Turn on the vacuum pump until the pressure drops below 0kg/cm2. (8) After vacuuming, disconnect the vacuum pump and open the spindle of service port (liquid-side) slightly for 30 sec and then open the spindle of (gas side) with hexagonal wrench. (9) Open the liquid side completely first and then the gas side fully in order.
�32�
|
|
|
> |
|